Anglia Formwork successfully completed the RC works’ to King Streets new property development, where a number of flats and apartments are being constructed above a ground floor commercial unit. Our RC work’s included the ground beams, columns and podium slab which were all finished to a high standard.

Program Duration:      12 Weeks

Concrete:                    422.3 m3

Reinforcement:           40 Tonne

New Basement for South Pickenham Hall

 

 

Anglia Formwork has just completed the RC works for the basement of the new extension to South Pickenham Hall. The build went along steadily but due to late design detail the job was delayed by two weeks. With a few modifications to our program we were able to successfully accelerate and regain the 2 weeks which allowed us to finish in time for the steel structure to be erected to get the job back on track.

Program Duration:   8 Weeks (reduced to 6)

Concrete:                 625 m3

Reinforcement:        60 Tonne

Grand Designs

Anglia Formwork featured on Grand Designs Last night and its fair to say our staircase and trombe wall stole the show!
Full article to follow.wall with steps

ISO 9001 Accreditation

Anglia Formwork achieved ISO 9001 accreditation on the 9th of May 2014; please contact us to find out more.

Chas Accreditation

Anglia Formwork achieved CHAS Accreditation on the 8th of March 2014; please contact us to find out more.